| Milestones
-----Original Message-----
We don't use networks and activities. The same time we want to use milestones only with WBS-elements for basic POC evaluation. For instance for WBS we can attach several milestones with different POC, like 10%, 50%, 80%. What is the tool in the system to confirm that particular milestone is reached? How can I change milestone status? -----Reply Message-----
each milestone attached to a WBS element will have an actual date field open for entery when u release the WBS element. this will determine if the milestone has been achieved or not. the %age entered in the milestone for POC will be considered in the progress analysis. -----End of Message-----