| Goods Receipt (101) for Process
Order
We are currently working on SAP 4.7.
Currently experiencing a problem where the
Goods Receipt (101) for Process order is taking place before a
confirmation is done. This causes a recon
variance during month-end, meaning the 101 movement takes place
e.g. last month and the confirmation done
in the current month.
Is there a way that I can customize/set the
system NOT to process a 101 movement UNTIL a Process order
is confirmed? So, whatever quantity was confirmed,
the 101 movement should take place for that quantity and not more.
Note: I have set the control key to NOT process
an automatic 101 movement.
Thanks in advance for your suggestions.
Poobie
You have 2 options.
1. You can use User Statuses for this. You define
the Confirmed user status and this user status lets goods receipt to be
done. If not active, you don't let goods receipt. And you set this user
status during confirmation, manually or you may use user exit to do this
automatically. Settings for this option can be done in Customizing.
2. You should be careful for this option! You
can edit the Standard statuses for this. The system has PCNF and CNF statuses
for partially confirmed and fully confirmed. As far as you have explained,
it seems that these statuses, when active, is configured that the system
lets goods receipt done. You can edit these statuses, to not to allow goods
receipt done, if inactive. Settings for this option is done throught Status
Editing transactions, BS23 for display, and BS22 for edit. I repeat, you
should be careful, and extra careful if this is the first time you are
using these transactions.
Hope it helps,
Osman.
That is one good TYPICAL problem of Production
Planning. I would suggest not to go for big developments which will take
long time to validate (may take even 3 or 4 months) because all other process
related to settlement is also involved for your RECONCILIATION.
Development for sake of adjusting the quantities
that you have calculated in EXCEL/Lotus - Can be considered. That is :
you will be actually trying to upload the EXCESS Production Quantities
or REDUCE Production Quantities in the existing Production Orders. Because
- You will definitely be doing a reconciliation outside SAP once. This
data need to be punched in to SAP. Typically by 3rd or 4th day of the Month
you will be doing this - I believe.
After your adjustment/reconciliation for the
last month - you have to give clearance for running the SETTLEMENT process.
Dhasarathy
Fast Links:
Get help for your SAP PP Problems
Do you have a SAP PP Question?
SAP PP Books
SAP Production Planning
Reference Books
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.sap-img.com
All the site contents are Copyright © www.sap-img.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.sap-img.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.sap-img.com or the content authors.
|