|
SAP PP Certification Sample Questions
Caution: more than one answer may be correct.
Please mark ALL correct answers.
Question:
The following control parameters can be set in a long-term planning
scenario :
A Planning period
B Opening stock
C Strategy group
D MRP type
E Version of available capacity
Question:
What is the name of the planning level for the MRP run?
A. SOP
B. MP
C. MRP
D. COPA
Question:
What are the main features of the MRP types 'PD' or 'VB'?
A. 'PD' can only be used with 'Net Change Planning'
B. 'VM' can only be used in total planning
C. 'PD' triggers a BOM explosion
D. 'VM' can use the forecast for the calculation of the safety
stock
Question:
What is the meaning of the planning time fence?
A. It determines the planning period for the planning run
B. It determines the period in which the planned orders are to
be converted into production orders
C. It determines the period in which no automatic changes are
to be made to the production plan
Question:
In forecast-based planning, which forecast model does SAP support?
A. dynamic model
B. seasonal trend model
C. split trend model
D. Consumption model
Question:
What conditions must be fulfilled in Customizing if a production
order is to be checked for availability?
A. Scope of check
B. Checking group
C. checking rule
D. Checking assignment
E. Inspection period
Answers
for SAP PP Certification Sample Questions
Q) Can any body explain me why work scheduling view is required for
semi finished and finished products? (Because we'll mention all details
in MRP views)
A) We need to maintain working scheduling view in order to make that
finished or semi finished goods available for production as we assign production
scheduler and production scheduler profile in this view, if not maintained
conversion of planned order to production will not be possible.
Fast Links:
PP Test Questions
Sample
Questions on SAP PP
Get help for your SAP PP Problems
Do you have a SAP
PP Question?
SAP PP Books
SAP Production Planning
and Control, Certification and Interview Questions Reference Books
SAP PP Tips
SAP PP Tips and Production Planning/Control
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.sap-img.com
All the site contents are Copyright © www.sap-img.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.sap-img.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.sap-img.com or the content authors.
|