Scenario of Rotating Equipment
How to configure the scenario of rotating equipment , i.e a Sub assembly
which can be used on line 1, line 2 and can also be kept in store . History
of the equipment should move along with it to each line.
Create the item as an equipment (IE01) this will fit into your scenario.
Then you can install and dismantle the equipment as it moves around functional
locations.
My Scenario is to move as well as store the equipment in stores as an
material but with its history.
A Equipment X is used in line 1, and removed and provided in line 2
and after some repairs kept in stores .from where it can be issued against
W/O for line 3/1/2
I feel equipment serial number management can help , but don't know
how to configure and use it .
Yes, you are right the serialisation process will help track where your
equipment is and has been. You will need assistance for the MM people to
have the serialisation activated in the material master (a special material
type may have to be created).
It is hard to explain how it works but I will give you an indication
of the process I used at a previous business.
They had Material types "ROTO" & REPA" which could be both serialised
for Rotable equipment. The serial number used in the material master was
the equipment number of the Rotable equipment.
-
Work Order created to replace equipment X on line 1.
-
Equipment Y book out of the store which changed the status to "AVLB"(the
serial number must be added before the equipment can be issued).
-
Equipment X physically replaced with equipment Y.
-
Equipment X position changed to "DISM" to show it is not currently in that
position.
-
Equipment Y is installed to the Functional Location and the position is
"INST" (including the correct date of installation).
-
Equipment X is repaired using the same Work Order (total costing reasons).
-
Equipment X is repaired and is ready to be booked back into the store.
-
The Work Order is Technically completed. (this must be done before dismantling
the equipment otherwise the link to the Functional location costing is
lost A serialised equipment carries no costing detail in the master data
because it gets it from the Functional Location it is installed on). Once
TECOed the data is locked.
-
Equipment X is dismantled from the Functional Location.
-
Equipment X is booked into the store which changes the status to "ESTO"
-
M3 Activity report detailing the repairs is created to equipment X.
I know it looks messy but the main thing is the planners have to manage
it otherwise equipment will get lost or end up in the wrong location. Start
small and expand don't implement until you understand how it works.
SAP PM Tips by : Graham Johnston
Fast Links:
Have a SAP PM Problems?
Do you have
a SAP PM Question?
SAP Books
SAP Functional, Basis Administration
and ABAP Programming Reference Books
SAP PM
SAP PM Tips and Plant Maintenance
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.sap-img.com
All the site contents are Copyright © www.sap-img.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.sap-img.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.sap-img.com or the content authors.
|