|
Plant Maintenance Q & A - Rept
& Analyses - Mgt of Task Lists
Reporting & Analyses
Q: What are the components of
the maintenance history?
A: Completed notifications,
completed and historical orders, usage lists.
Q: How can you display a list
of install locations for a piece of equipment?
A: In transaction IE02, change equipment
use the menu path >extras>usage list, ensure location field is displayed
in the
current variant.
Q: What are the central modules
for evaluations and analysis in the PMIS?
A: Information structures form
the basis for standard analysis, they contain a combination of characteristics
and key
figures with time base (period) The available
information structures are: S016, S062, S063, S065, S115 and S116.
Q: What is standard analysis,
what are available in SAP?
A: Standard analysis are complete
predefined analysis that stop at one of the standard information structures.
The
following are available: object class,
manufacturer, location, planner group, damage analysis, object statistics,
breakdown
analysis, cost analysis.
Management of Task Lists
Q: How is usage, status and increment
controlled for the task list and how can these parameters be predefined
for the user?
A: From within the transaction
IA05, create general task lists, status and increment are defined by populating
the user
profile with the parameter PIN and value
of increment example 0000001.
Q: How does the control key come
into the task list as default?
A: The control key is copied
from the work centre default values screen
Q: What is the structure (main
components) of a task list?
A: The task list comprises
of a header containing default data, an operations screen containing details
of tasks to be
performed during maintenance and there
is an components screen containing spare part material information. There
are also
functions for relationships, PRT’s and
where applicable functions for inspection characteristics, service and
maintenance
packages.
Q: What types of task lists are
available?
A: Functional location, equipment
and general task lists?
Q: What is different about general
task lists?
A: Unlike functional location and
equipment task lists, general task lists are maintained independent of
a object, the
general task lists can be split by group,
each group can have a maximum of 99 counters which can be regarded as individual
task lists. The functional location
and equipment task lists are object dependent, the object acts as the group
in this case and
there can be 99 task lists per object.
Q: Making a cost estimate for
a task list, how would you proceed?
A: Use transaction IA16, evaluations>task
list costing.
Q: What options are available for entry
of task lists into a work order?
A: Direct entry, to reference object,
general task lists for assembly, general task lists for object structure
and general
task lists.
Q: Generate a where used list
for a work centre, how do you proceed?
A: Evaluations>work centre
where used, transaction CA82.
Q: How do you create a configuration
profile for configurable task lists?
A: Plant maintenance>planned
maintenance>maintenance task lists>task lists>general task lists>configuration
profile>create
*-- Tips by Bill
Have a SAP PM Problems?
Do you have
a SAP PM Question?
SAP Books
SAP Certification, Interview
Questions, Functional, Basis Administration and ABAP Programming Reference
Books
SAP PM
SAP PM Tips and Plant Maintenance
Discussion Forum
Best regards,
SAP Basis, ABAP Programming and Other IMG Stuff
http://www.sap-img.com
All the site contents are Copyright © www.sap-img.com
and the content authors. All rights reserved.
All product names are trademarks of their respective
companies. The site www.sap-img.com is in no way affiliated with
SAP AG.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
The content on this site may not be reproduced
or redistributed without the express written permission of
www.sap-img.com or the content authors.
|